13 men can weave 117 baskets in a week,how many men will be needed to weave 171 basket in a week?​

Dear Student,

13 men can weave 117 baskets in 7 days.1 men can weave = 11713=9 baskets in 7 daysMen needed to weave 171 baskets = 1719= 19 men