Calculate the work done in raising a stone of mass 5 kg and specific gravity 3 lying at the bed of a lake through a height of 5 metre.
Calculate the work done in raising a stone of mass 5 kg and specific gravity 3 lying at the bed of a lake through a height of 5 metre.