NCERT Solutions
Board Paper Solutions
Ask & Answer
School Talk
Login
GET APP
Login
Create Account
Popular
Latest
Expert Answers
ALL
Jai
Subject: Maths
, asked on 11/6/21
Title: Manufacturing Water Tank Material Iron Metal Sheet
Shape Cuboidal
Take Y as your Roll Number -5
Length 5y meter
Breadth 4y meter
Height 3y meter
1.
Find Volume of Tank in cubic meter
2.
Find Surface Area of Tank in sq.
M
.
Tank is filled with water using a cylindrical pipeline. Diameter of pipeline 50y cm
Velocity of water 5 m/s
3
Find the time required to fill the tank.(in minutes)
4
Find the area of metal sheet required to make the tank.
5.Assume 20% wastage during maufacturing.Find the number of persons if one person requires 200
litres of water daily.
6.Find the weight of the tank.(in kg)
.
Density of metal = 7800 kg per cubic meter .Thickness of metal sheet = 10 mm . Rate of metal sheet = Rs 100y per sq m
7
Find the cost of the metal sheet(in Rs)
Take Labour cost = 50% of material cost
8. Find the total cost of the tank.
9. Analysis ....
icse calss 10 icse
Answer
1
Jai
Subject: Maths
, asked on 9/6/21
Tank is filled with water using a cylindrical pipeline. Diameter of pipeline 50y cm
Velocity of water 5 m/s
1
Find the time required to fill the tank.(in minutes)
2
Find the area of metal sheet required to make the tank.
5.Assume 20% wastage during maufacturing.Find the number of persons if one person requires 200
litres of water daily.
3
.Find the weight of the tank.(in kg)
.
Density of metal = 7800 kg per cubic meter .Thickness of metal sheet = 10 mm . Rate of metal sheet = Rs 100y per sq m
4
Find the cost of the metal sheet(in Rs)
Take Labour cost = 50% of material cost
5. Find the total cost of the tank.
6. Analysis ....
Answer
3
Jai
Subject: Maths
, asked on 9/6/21
Title: Manufacturing Water Tank Material Iron Metal Sheet
Shape Cuboidal
Take Y as your Roll Number
Length 5y meter
Breadth 4y meter
Height 3y meter
1.
Find Volume of Tank in cubic meter
2.
Find Surface Area of Tank in sq.
M
.
Tank is filled with water using a cylindrical pipeline. Diameter of pipeline 50y cm
Velocity of water 5 m/s
3
Find the time required to fill the tank.(in minutes)
4
Find the area of metal sheet required to make the tank.
5.Assume 20% wastage during maufacturing.Find the number of persons if one person requires 200
litres of water daily.
6.Find the weight of the tank.(in kg)
.
Density of metal = 7800 kg per cubic meter .Thickness of metal sheet = 10 mm . Rate of metal sheet = Rs 100y per sq m
7
Find the cost of the metal sheet(in Rs)
Take Labour cost = 50% of material cost
8. Find the total cost of the tank.
9. Analysis ....
icse calss 10 icse
Answer
1
Rimjhim Jeena
Subject: Maths
, asked on 12/4/21
Please help me solve the following :
Answer
1
Anindita Sarkar
Subject: Maths
, asked on 28/3/21
Please solve question no.b.
Answer
1
Anindita Sarkar
Subject: Maths
, asked on 26/3/21
Please solve question no. b.
Answer
1
Anindita Sarkar
Subject: Maths
, asked on 25/3/21
Please solve question no.b.
Answer
1
Anindita Sarkar
Subject: Maths
, asked on 25/3/21
Please solve question no.c. and a.
Answer
1
Anindita Sarkar
Subject: Maths
, asked on 24/3/21
Please solve question no.b.
Answer
3
Milan
Subject: Maths
, asked on 16/3/21
Please solve Q. No. 5
Answer
2
Kushagra Rastogi
Subject: Maths
, asked on 15/3/21
From a solid cylinder of height 28 cm and radius 7 cm, a conical cavity of radius 7 cm and height 21 cm is drilled out. The remaining solid is melted and recast into a solid cylinder of diameter 7 cm. Find the height of cylinder formed
Answer
2
Milan
Subject: Maths
, asked on 7/3/21
Please Solve Q. No.2
Answer
1
Rimjhim Jeena
Subject: Maths
, asked on 6/3/21
Please solve it .... answer is 8cm
Answer
1
Milan
Subject: Maths
, asked on 2/3/21
Please solve Q. No. 3
Answer
1
Milan
Subject: Maths
, asked on 1/3/21
Please solve Q. No.1
Answer
1
Prev
1
2
3
4
5
Next
What are you looking for?
Shape Cuboidal
Take Y as your Roll Number -5
Length 5y meter
Breadth 4y meter
Height 3y meter
1. Find Volume of Tank in cubic meter 2.Find Surface Area of Tank in sq. M .
Tank is filled with water using a cylindrical pipeline. Diameter of pipeline 50y cm
Velocity of water 5 m/s
3 Find the time required to fill the tank.(in minutes)
4 Find the area of metal sheet required to make the tank.
5.Assume 20% wastage during maufacturing.Find the number of persons if one person requires 200
litres of water daily.
6.Find the weight of the tank.(in kg) .
Density of metal = 7800 kg per cubic meter .Thickness of metal sheet = 10 mm . Rate of metal sheet = Rs 100y per sq m
7 Find the cost of the metal sheet(in Rs)
Take Labour cost = 50% of material cost
8. Find the total cost of the tank.
9. Analysis ....
icse calss 10 icse
Velocity of water 5 m/s
1 Find the time required to fill the tank.(in minutes)
2Find the area of metal sheet required to make the tank.
5.Assume 20% wastage during maufacturing.Find the number of persons if one person requires 200
litres of water daily.
3.Find the weight of the tank.(in kg) .
Density of metal = 7800 kg per cubic meter .Thickness of metal sheet = 10 mm . Rate of metal sheet = Rs 100y per sq m
4 Find the cost of the metal sheet(in Rs)
Take Labour cost = 50% of material cost
5. Find the total cost of the tank.
6. Analysis ....
Shape Cuboidal
Take Y as your Roll Number
Length 5y meter
Breadth 4y meter
Height 3y meter
1. Find Volume of Tank in cubic meter 2.Find Surface Area of Tank in sq. M .
Tank is filled with water using a cylindrical pipeline. Diameter of pipeline 50y cm
Velocity of water 5 m/s
3 Find the time required to fill the tank.(in minutes)
4 Find the area of metal sheet required to make the tank.
5.Assume 20% wastage during maufacturing.Find the number of persons if one person requires 200
litres of water daily.
6.Find the weight of the tank.(in kg) .
Density of metal = 7800 kg per cubic meter .Thickness of metal sheet = 10 mm . Rate of metal sheet = Rs 100y per sq m
7 Find the cost of the metal sheet(in Rs)
Take Labour cost = 50% of material cost
8. Find the total cost of the tank.
9. Analysis ....
icse calss 10 icse